top of page

H&M

Crystal Run Galleria

1 Galleria Drive, Middletown, NY 10941

Project Details

  • We did an elevator and crossed escalators on this project

  • Major excavation for the escalator pit, steel work to support

  • the mall during the excavation, concrete work, electrical,sprinkler, etc…

  • We had to pour concrete pit in a running underground stream.

  • Installation of the escalator and the elevator

precon-logo-KO.png

35 HIGH STREET | POUGHKEEPSIE, NY 12601

2024 © PRECISION CONTRACTOR

bottom of page